London, United Kingdom16:31
000%

A small practice in east London. Every project is run by the person who drew it.

The practice

Founded
2016
Studio
London E2
Size
Six
Work
Houses, workplace, a little hospitality
Typical span
14–20 months
Live at once
Six, across four leads
01

Survey before ideas

We measure the building properly before proposing anything, because the interesting decisions are almost always forced by something already there — a beam in the wrong place, a floor that steps, a window that cannot legally move. Ideas that arrive before the survey tend to be about our taste rather than the building.

02

One drawing set, kept current

There is a single set of drawings and it is the one on site. Revisions go into it the day they are agreed, by the person who drew it in the first place. It sounds procedural, but most of the expensive mistakes we have seen came from two versions of the truth being on the table at once.

We would rather specify four materials well than fourteen carefully.

Studio note
03

We stay until it is finished

The last five percent — the junctions, the switch positions, where the shadow gap dies into the architrave — is where a room is won or lost, and it is the part most likely to be delegated. It is not delegated here.

Who you work with

  • Mike Wigglesworth

    Mike Wigglesworth

    Director, project lead

  • Delphine Roux

    Delphine Roux

    Studio manager

  • Tobias Ferrand

    Tobias Ferrand

    Project lead

  • Ariel Lopez

    Ariel Lopez

    Project lead

  • Sam Pryce

    Sam Pryce

    Project lead

  • Bram Garcia

    Bram Garcia

    Architectural assistant

The studio

Vyner Street, second floor
Samples, mostly in use
The long table, where sets get marked up

Work with us

Tell us about the building and what is not working about it. We reply to everything, usually within a week.

Let’s talk