London, United Kingdom16:31
000%

Alder Studio

Location
Margate
Year
2025
Typology
Workplace
Area
95 m²
Interior design
Wigglesworth
Photography
Contractor
01

Working to the light

Glaze reads differently under warm light, so every decision followed from keeping the north windows unobstructed. Storage went to the south wall where the shadow falls, the wet bench sits under the glass, and the palette stays close to unfinished clay so nothing on the shelf is competing with the room.

The wet bench is the one fixed thing in the room. Everything else is on castors, because a workshop that cannot be rearranged stops being a workshop about two years in.
The kiln bay, lined and vented
Clear floor around it, which the brief called wasted

The workshop

Wet bench, north wall
Drying shelves
The kiln bay
Glaze store, kept dark
Wedging table
The wheel, and the only chair
Racks by the door
Damp cupboard
Packing bench
The shelving is deliberately shallow. A deep shelf becomes a place to lose work, and a ceramicist needs to see the whole batch at once.
Glaze store, south wall, in shadow all day
Everything labelled, because nothing is transparent

The north wall, unobstructed, which was the whole brief.

Sealed concrete, laid to a drain
The one soft surface, by the door

End to end, on a working day.

Next project

Quay Terrace

2024 · Residential · Bristol

Working on something similar?

Tell us about the building and the scope. We reply to everything, usually within a week.

Let’s talk